Grand Egyptian Museum

Giza | Contracted

Projects in numbers 

150
Phase 1 costs (Million)

EHST’s Structural Scope of Work on the Project:

    • Checking steel stability at the roof of the museum
    • Proposing a methodology for changing the location of the Solar boat from the pyramids to the Grand Egyptian Museum. (Tender)