UCE New Administration Capital

New Administration Capital | Contracted

Projects in numbers 

150
Phase 1 costs (Million)
80
Phase 2 costs (Million)
  • Phase 1 consists of 2 buildings (800 m2, 2400 m2 ) each one contains seven floors,
  • Phase 2 consisting of 1 building (2400 m2 ) contains seven floors.
  • Phase 1 costs 200 million EGP.
  • Phase 2 costs 100 million EGP.

EHST’s Structural Scope of Work on the Project:

  • Analysis the buildings under vertical loads
  • Design different structural members
  • Detail for all structural drawing
  • BOQ and prepare tender documents
  • Site supervision.
  • Check the materials used in façade,
  • Check the material used in landscape,
  • Check the material used in full furnished,
  • Propose architectural solutions,
  • Detailing for all architectural drawings,
  • BOQ and prepare tender documents, and
  • Site supervision for all architectural works.
  • Check the materials used in electrical,
  • Check the material used in fire fighting,
  • Check the material used in HVAC,
  • Check the material used in water and plumbing,
  • Propose electrical and mechanical solutions,
  • Detailing all mechanical drawings,
  • BOQ and preparing tender documents, and
  • Site supervision for electromechanical works.