- Inco – Tech steel factory consists of three phases.
- The first phase is steel factory on 10000 m2,
- The cost of the first phase was 15 million EGP.
EHST’s Structural Scope of Work on the Project:
- Analysis of the factories under vertical loads,
- Design different structural members,
- Detail for all structural drawing,
- BOQ and prepare tender documents, and
- Site supervision until finishing the project.